1-800-795-1215

Hospitality

Projects

Element by Westin

Location: Bloomington MN

To be completed: 2020

Holiday Inn Express Renovation

Locations: New Berlin WI

To be completed: 2019

AC Hotels by Marriott

Location: St. Louis Park MN

Completed: 2018

Exclusive luxury hotel, underground parking, curtain wall system, structural steel, cast in place/pre-cast concrete, full restaurant, rooftop bar, ~ $1 million in value engineering, and heavy soil corrections and site dewatering required.

Home2 Suites by Hilton

Location: Plymouth MN

Completed: 2018

Our third Home2 Suites project which featured 5-story wood frame construction and was completed in 11 months from hotel groundbreaking to occupancy. The contract included additional site work, storm detention and parking lot for the adjacent hotel and Lucky’s 13 restaurant.

Home2 Suites by Hilton

Location: Minnetonka MN

Completed: 2017

Our second Home2 Suites project which featured 5-story wood frame construction
and extensive soil correction/retaining wall work and site prep.

Comfort Inn Renovation

Location: Plymouth MN

Completed: 2017

Remodel of the reception, common spaces, hallways, and elevators.

Holiday Inn Express

Location: Eagan MN

Completed: 2016

Site work included demolition of an existing structure to make way for this 4-story wood frame hotel.

Holiday Inn Express Renovation

Location: Roseville MN

Completed: 2016

Top to bottom, inside and out – this property received a full remodel plus an indoor
pool addition.

Hampton Inn & Home2 Suites

Location: Roseville MN

Completed: 2016

Dual-branded hospitality project featuring the construction of two hotels simultaneously – a Home2 Suites and a Hampton Inn. Pictured here is the 5-story wood frame Hampton Inn.

 

Holiday Inn Express Renovation

Location: Golden Valley MN

Completed: 2015

Remodel of the reception, common spaces, hallways, and guest rooms. Structural modifications removed three 2nd story rooms above the breakfast dining space to create a lofted open look and feel.